Pre or Post Completion? When to Get a Snagging Survey on Your New Build

By the Snag Safe inspection team ·

You’ve reserved your new build, the completion date is getting closer, and someone has told you to “get a snagging survey”. The next question is usually when. Before you complete? The week you move in? Or a few months later, once you’ve lived there for a bit?

The short answer: as early as you can, and ideally in the first couple of weeks after you get the keys. Here’s why, and how to choose between a Pre Completion Inspection and a Post Completion snagging survey.

What is a snagging survey?

A snag is anything in a new home that’s damaged, unfinished, or not built to the required standard. Some snags are cosmetic: paint on the carpet, scratched window frames, a door that catches. Others matter much more: missing insulation, loose loft ducting that lets damp air into the roof space, or a window fitted out of plumb that lets water in.

A snagging survey is an independent inspection of the whole home by someone who knows what to look for. You get a report listing every issue, with photos and a note on what needs fixing, which you send to your builder so they can put it right.

Most of the serious problems aren’t visible on a walk-round. In one recent home our inspector found 98 issues, 15 of them needing immediate attention. You can see that report here.

The two options: before or after completion

Pre Completion Inspection (PCI): before you move in

A Pre Completion Inspection happens before legal completion, while the home still belongs to the developer. If your developer is registered with the New Homes Quality Board, the New Homes Quality Code gives you the right to have the home inspected before you complete, so the developer can’t simply refuse access.

A PCI follows a standard checklist format. It’s a good fit if:

  • you want issues raised before you hand over the money
  • you won’t be able to inspect easily after moving in (for example, you’re moving straight in with children or a lot of furniture)
  • your developer has a set PCI window and you want to use it

More about our Pre Completion Inspection.

Post Completion snagging survey: after you get the keys

A Post Completion snagging survey happens once the home is legally yours. Because it isn’t limited to a checklist, it goes further: we check workmanship against the NHBC Standards and Building Regulations, including tolerances (how level, plumb and straight things should be).

It’s a good fit if:

  • you’ve already completed, or you’re completing soon and want the most thorough report
  • you’ve moved in and started noticing problems
  • you want thermal imaging with the heating running, which shows up insulation gaps and cold spots more clearly

Compare our inspections.

At a glance

Pre Completion InspectionPost Completion snagging survey
WhenBefore legal completionAfter you get the keys
What it coversStandard PCI checklistFull inspection against NHBC Standards and Building Regulations
Best forRaising issues before you payThe most detailed report
Thermal imagingIncludedIncluded
ReportWithin 5 working daysWithin 5 working days

Why the first two weeks after completion is usually best

You have up to two years after completion to report defects to your builder under most new home warranties. That doesn’t mean it’s worth waiting. We recommend booking between the day after completion and about 14 days after, because:

  1. The home is empty. Without furniture, boxes and rugs, we can see every wall, floor and skirting board, and get into every cupboard.
  2. It’s clear who caused the damage. A chip in the worktop found in week one is the builder’s. Found six months later, the builder may argue it was you.
  3. Builders fix things faster early on. Site teams are often still on the development in the first weeks, so repairs can be booked in quickly.
  4. Small problems stay small. A slipped extractor duct or a gap in the sealant is a quick fix now. Left for a winter, it can mean condensation, mould or water damage.

Already moved in? It’s not too late. A snagging survey any time in the first two years still gives you a full, photographed list to send to your builder. One of our customers had their inspection six months after moving in, expecting very little, and we found 71 issues.

What about the end of the two-year warranty?

In years three to ten, most new home warranties only cover major structural problems, and the builder is no longer responsible for everyday defects. So if you had a survey when you moved in, a re-inspection before the two years is up is worth considering. We check the original snags have actually been fixed and look for anything new, such as cracks from the house settling.

How to get the most from your survey

  • Tell your site manager we’re coming if you haven’t completed yet.
  • Make sure the power, water and heating are on. Thermal imaging works best with the heating running.
  • Clear access to the loft, garage and outside areas.
  • Be there if you can. You’re welcome to follow the inspector round and ask questions.
  • Send the report straight to your builder’s customer care team, and keep a copy of everything.

So, is a snagging survey worth it?

A new home is the biggest thing most of us ever buy, and the builder is responsible for putting defects right at no cost to you, but only if you find and report them. A professional survey costs a fraction of what one hidden problem can cost to fix later, and gives you a clear, photographed record that’s hard for a builder to argue with.

If you’re not sure which inspection you need, send us your completion date and we’ll tell you, or check prices for your home.